Search This Blog

Showing posts with label None. Show all posts
Showing posts with label None. Show all posts

Thursday, April 7, 2011

Compost bin



Here's a pic of the compost bin we made

Posted from my Android phone via Blogaway

Saturday, March 26, 2011

Good job babe!


Kudos to my beautiful wife.  Curving in on TED from denver, I've noticed she is averaging less thsn 20 kwh for daily power usage with a low of 15!  

When my family was in town for the ncaa tournament we averaged about 50 kwh...but that was with 6 people in the house plus with two tvs on for 8-12 hrs.

Posted from my Android phone via Blogaway

Saturday, March 5, 2011

Driveway complete!



Looks great!  Can't wait to try it out...

Posted from my Android phone via Blogaway

Friday, March 4, 2011

Almost there


Inspection complete!  All good.

Customer package info...check!

(includes tax credit info)

Driveway guy is forming up today.

Tomorrow, they put concrete.

So, by monday, everything should be 100% finished.

Only thing left is for the grass to grow in the front yard....and I have to step side and let mother nature do that for me.

Posted from my Android phone via Blogaway

Friday, February 25, 2011

Upstairs system online!



Yeah!  The hvac guys are done and the system is online.  there's a little bit of catching up to do, now.  also the front drill spoils need to be cleaned up but after that everything will be done.  Then we can do the driveway.  pictures soon to follow...

Posted from my Android phone via Blogaway

Thursday, February 24, 2011

Look ma, no heat pumps



A pic of my "reclaimed" garden

Posted from my Android phone via Blogaway

Monday, February 21, 2011

Lake johnson



Its getting full...  Luckily, the drillers are done

Posted from my Android phone via Blogaway

Saturday, February 19, 2011

Drill



Here's a pic of the drill rig.  You can see the 3 completed wells with the pipes sticking out.  One more to go..which will be completed on monday.  Hopefully the entire project will be complete as I'm in missouri and my wife is away too.

Posted from my Android phone via Blogaway

Monday, February 14, 2011

Pic



Here's a pic of the attic duct work before it goes up to the attic to be installed.

Posted from my Android phone via Blogaway

Monday, January 31, 2011

One step closer


We got approval from the HOA for the driveway (no approval needed for hvac).  Now, it's time for scheduling....

Posted from my Android phone via Blogaway

Sunday, January 23, 2011

Helping hand

Just spent 8 hrs yesterday helping my friend, Nate,  work on his house.  He got an energy audit too and found his house very leaky.  I seriously do not want to smell silicone (caulking) for a while. 

Except now I feel like I need to tackle some of those small things myself.  Liking back at my audit, there were two rooms that had some small leakage.   Maybe I'll tackle those tonight...

Fyi, I got myself an attic tent out off it.  He had one on his attic, but it was not installed because it didn't fit.  So I'll install that in mine...

Finally I got a second quote in for geothermal hvac.  This one was 45k...or 25% higher than my original quote.  Not surprising I started my return email with "i regret to inform you..."

Posted from my Android phone via Blogaway

Friday, January 21, 2011

Doing great...


From TED, our usage has decreased significantly.  Sunday thru thursday we've used the following:

Sun 61 kWh

Mon 72 kWh

Tues 75 kWh

Wed 36 kWh!

Thur 52 kWh

If you consider the previous 8 days were at 100 kWh our more, this is great.

The results are a combo of more attic insulation and using the gas log in the AM and PM to get the temp up in lieu of the crappy heat pump electric heat.

Posted from my Android phone via Blogaway

Sunday, January 9, 2011

Electric bill

Just got our electric bill for last month (before TED)...all I can say is holy f@#&$ sh@#!!!!  It was $253.   That's just ridiculous.  It averaged 95 kwh over 30 days.  This month probably isn't going to be much better.  All the more reason to go geothermal...

All done



It took about 3.5 hrs,  but the work is complete.  Now I wait for the results...


Before and after



Here's a quick pic as we work of before and after with the insulation