Geothermal System Complete!

Well folks...the geothermal installation is complete.  The upstairs unit is functional and they've cleaned up.  I've posted some pics below.  Now, I just need to get the drilling folks back here to remove the rest of the "spoils" and get the concrete guy to pour our new driveway/walkway.  It's funny because I was worried last night after I noticed TED showing an extra constant ~300 W.  Talking to the HVAC guy, that was because the upstairs thermostat wasn't functional...so the flow center didn't have a signal to 'shut off' so it kept running.  Now that everything is functional, the 'mystery' 300W is gone.

Here's the hydronic unit (located in the crawl space) for the upstairs 
Here's the downstairs combo hydronic and air handler.  You can see the new crawl space duct work in the background. 
Here's the flow center.
Here's a pic of all three units.  You can see the return/supply lines running in the background.
Here you can kind of see the desuperheater connection to the hot water heater
Here's the upstairs air handler connecting to the new duct work.
Here's the new duct work to the bonus room.  This should help significantly especially during the summer months as that old duct work was falling apart.
The HVAC guys installed my attic tent for me...even though I didn't ask.  Thanks guys!
Here's where the old heat pumps were located.  Ahh...no more!  You can see the new drain.

2 comments:

  1. So is there anything else that needs to be done? I am impressed at how fast it all went once they got started. I can't wait to see it all!

    ReplyDelete
  2. The drillers cleaned up the drill 'spoils' yesterday...I need to post pics. Also the concrete driveway and walkway needs to be poured. That could be poured today.

    ReplyDelete